施工方法:
确认待涂胶地坪必须清洁、干燥、光滑,水泥地面不起沙.
建议用A2/A3锯齿刮刀均匀涂刮,待胶晾至透明,至用手
指触摸判断(时间约10-20分钟)即可铺设地板材料.
铺下地板后,用木板滚筒滚压以排除因入的空气确保胶水全
部粘接到地板背面.
Construction ways:
1.Make sure the floor is clear,dry,smooth and having no sands.
2.please use A2/A3 sawtooth cutter to spread glue. After open time 10-20min,the glue is dry.Then the substrace is ready to lay floors.
3.After the flooring material is applied on the substrace,rub the surface by wood roller to dremove entranced air under the floor.
理论涂布量:每公斤涂布7-9平方米
Theoretical Application Rate:one kilogram glue for 7-9 square meters.
注意事项:本产品储存温度为5-35℃,应密闭储存,防止强光照射并注意防冻,本产品属于非危险品。
Warnings:The best storing temperature for our product is 5prefix = st1 ns =